About
Custom Home Building Home Remodeling Kitchen Remodeling Bathroom Remodeling ADU / Room Additions Commercial Build-Out Outdoor Living View All →
Gallery Projects
La Jolla Coronado Point Loma Del Mar Encinitas Mission Valley North Park Escondido Poway El Cajon La Mesa Spring Valley Alpine
Contact (619) 9711354
Project · Campo, East County

Two Bathrooms
Rebuilt in Campo

Two bathrooms in an older house, taken down to the brick and studs and rebuilt: new plumbing, tile, vanities, lighting and glass. One got a tub with a sliding glass door, the other a walk-in shower.

Ask About a Bathroom Remodel
Finished bathroom in Campo with a sage shaker vanity, white counter, matte black fixtures and a tub with a sliding glass door
The Project

Down to the brick,
then back up

This house in Campo has brick walls behind the drywall, and both bathrooms were worn out. We took them down to the brick and the studs, ran new supply and drain lines, and built them back with large marble-look tile, sage shaker vanities and matte black fixtures. It's the kind of full rework our bathroom remodeling covers, not just new fixtures on old walls.

Campo is out in the far east of San Diego County with no city government of its own, so permits for work like this go through the County. The photos below were taken on site, from demolition to the finished rooms.

  • LocationCampo, unincorporated San Diego County
  • ProjectTwo bathroom remodels
  • ScopeDemolition, new plumbing, tile, vanities, lighting, glass
  • FinishedOne tub with a sliding glass door, one walk-in shower
01
Demolition

Taking out
the old bathroom

Demolition took the old shower and floor tile out and opened the walls. Behind the drywall and the old backer board was the house's brick, with plywood patched in above it.

Bathroom in Campo during demolition, with the shower walls opened to brick and the floor tile removed
02
What We Found

Brick behind
the shower

Where the old shower stood, the walls came off down to the brick and the old drain was exposed. With everything open, any damage behind the old shower is in plain view before anything new goes in.

Old shower area in a Campo bathroom stripped to brick, with the drain and supply lines exposed
03
Rough Plumbing

New supply
and drain lines

With the framing open, new copper supply lines and black ABS drain lines went in for the sinks, toilets, tub and shower, before the walls were closed up again.

New copper supply and ABS drain lines run through open wall framing during a Campo bathroom remodel
04
Finished

The walk-in
shower bath

The second bathroom got a walk-in shower behind a tiled half wall with a frameless glass panel and door, a small mosaic tile floor in the shower and a niche in the wall. The large floor tile runs through the room to the vanity.

Both rooms got new exhaust fans and lighting. You can see the first bathroom, with its tub and sliding glass door, at the top of the page.

Finished bathroom in Campo with a walk-in shower, tiled half wall, frameless glass and a sage vanity
Keep Looking

More of our work

Tired of Your Bathroom?

Ready to start
on your bathroom?

Send a few photos of the room and tell us what bothers you about it. Chris will tell you whether it needs new fixtures or a full rework, and what that usually costs.

Call Now Free Estimate